
Coastal Craft Roofing
ROI-positive in three months: 6+ jobs from organic search alone, top-3 rankings, domain rating 0.6 to 21, and a new crew hired to keep up.
Read the case studyRecent work
Live builds for established businesses, each one custom raw code with SEO and conversion built in. Detailed case studies with results are being added; visit any site to see the work.

ROI-positive in three months: 6+ jobs from organic search alone, top-3 rankings, domain rating 0.6 to 21, and a new crew hired to keep up.
Read the case study
From no online presence to #1 rankings in 13 countries, paintings selling online, and a royal-patronage magazine feature — with no SEO retainer.
Read the case study
A specialized barging operation that hit #1 on Google within two days of launch.
Read the case study
Rock and low-water landscaping, family-run for 20+ years, with a conversion-focused site built to match.
View project
Fast, mobile-first HVAC site engineered for booked jobs, from -30° to just right.
View project
Province-tailored COR and SECOR safety programs, with a site built to win the bids their clients were losing.
View projectThese are live client sites. Full case studies with results are on the way.
No pressure. No guessing.
The audit is free, it's fast, and most owners are surprised by how much opportunity it surfaces. If there's a clear pathway to ROI for your business, I'll show you. If there isn't, I'll tell you that too.
Prefer to talk it through?